How to Plan a Whole-School Wall Graphics Project

A comprehensive School Resource Guide for all UK schools considering installing large-scale wall graphics across departments, corridors and buildings.

Summary (quick answer)

A Whole-school wall graphics project will inevitably require careful phasing and survey work to ensure teaching is not interrupted, careful consideration of the curriculum and the staging of the scheme to avoid congestion in corridors, and careful sequencing of the application of the design to avoid waste of product.

The difference affects:

  • Budget forecasting
  • Curriculum integration
  • Department coordination
  • Installation scheduling
  • Durability planning
  • Long-term scalability
Best for: full-school transformations Best time: summer holidays Key risk: poor installation

Transform Your Learning Environment

Transform Your Learning Environment

Strategic Foundations Before Design Begins

Leadership Alignment

Senior leadership must define the project's educational purpose before designers can begin work on its layout and design.

Scope Mapping

All proposed areas must be documented and categorised before budgeting or visual development.

Decision Making Structure

The small Approval group prevents delays, which can be caused by differing opinions or the need for many rounds of revisions.

Defined Educational Objectives

The project should link to at least one of the behaviour, curriculum or identity aims. The project should have an impact beyond just making the area look prettier.

Budget Banding Clarity

Clear financial boundaries prevent design development from exceeding realistic investment capacity.

Timeline Framework

A structured master schedule coordinates surveying, design, production and installation stages.

Our Values, Your Culture

Surveying and Site Readiness Planning

Full Wall Audit

Every proposed wall is measured accurately before artwork scaling or layout approval begins across departments.

Access Risk Assessment

Height access and restricted zones are identified early to plan equipment, supervision and safeguarding requirements.

Cleaning Scedule Review

Maintenance practices for laminate flooring can influence the choice of product and the level of performance expected in commercial high-traffic areas.

Surface Condition review

The wall finishes are examined for potential adhesion failures caused by incompatible paints or unstable substrates.

Obstacle Documentation

Doors, radiators, and architectural fixtures are drawn before the room layout scale is confirmed.

Environmental Light Mapping

The lighting conditions are scrutinised to avoid glare, fading or colour change over the length of the corridor.

Enhancing Navigation and Identity

Phasing and Department Coordination

Department Sequencing

Our rollout order takes into consideration sensitive periods to avoid impacting active teaching, exam and assessment periods.

Curriculum Phase Grouping

Subjects are grouped logically to maintain progression clarity and consistent visual standards across departments.

Communication Planning

To avoid any confusion regarding timing, access restrictions, or the sequence of installation, all staff members are informed accordingly.

Holiday Installation Strategy

High-traffic corridors and stairwells are prioritised during extended school closure periods to reduce disruption.

Building-by-Building Planning

Multi-building campuses require structured sequencing to prevent logistical inefficiencies and repeated equipment mobilisation.

Future Expansion Provision

Design systems help you plan for future pages and additional sections or features you want to add later without compromising the site's look and feel.

Creating Calm Spaces

Long Term Value and Sustainability Planning

Material Longevity Planning

High-traffic areas demand more from flooring materials, and vinyl and laminate floors often need to withstand heavy cleaning and intense foot traffic.

Lifecycle Budget Awareness

Investment decisions consider replacement frequency and long-term cost exposure over several years.

Disruption Minimisation Strategy

Sequenced installation reduces repeat closures and avoids unnecessary operational disturbance.

Maintenance Guidance Framework

Schools receive structured cleaning guidance to protect installation performance and extend lifespan.

Scalability Consideration

Design systems allow extension across new buildings or phased refurbishment programmes.

Accountability Structure

Clear responsibility prevents confusion if scaling inaccuracies or adhesion issues arise later.

Why Whole-School Projects Frequently Lose Momentum


Most large projects start strong but, in due course, fall apart through lack of focus because the scope of work gets out of control.


These are not uncommon occurrences. Many departments request inclusion mid-project, which can impact the budget and timeline. Graphic approvals can occur without dimensional control, increasing the potential for scaling errors. Installation sequencing can be under- or overestimated, often due to the complexity of campuses with multiple stairwells, long corridors and multi-building facilities.


Whole-school projects introduce layered complexity:

  • Multiple stakeholders with competing priorities
  • Restricted holiday installation windows
  • Varying wall conditions across buildings
  • Inconsistent internal communication
  • Budget expansion without structural review
  • Without structured oversight, decisions become reactive rather than strategic.


To ensure cohesion, the phasing must be clear, approval structures kept short, and budget triggers defined.

Where Structured Planning Becomes Critical

The level of detail required in your planning will significantly increase when you graduate from working on isolated feature walls and start to venture into corridors that connect multiple spaces.


Long corridors exacerbate alignment inconsistencies over longer lengths than typically encountered, and stairwells present height access and safety issues. Multi-phase sites present a range of access and enablement issues when working across different buildings. Curriculum-linked drawings and associated annotations require detailed communication with subject heads of department to ensure continuity of learning.


In these environments:

  • Measurement accuracy becomes non-negotiable
  • Installation sequencing affects visual continuity
  • Safeguarding compliance restricts flexibility
  • Durability specification influences cost exposure
  • Communication breakdowns multiply risk
  • Small oversights compound quickly at scale.


Preparation of all elements is important for maintaining operational stability and creating a unified and purposeful space.

A Clear Definition

A whole-school wall graphics project is defined as a program that transforms several learning spaces across multiple areas of a building, links to the curriculum, considers the building's topography and walls, and is delivered in stages.

More than an isolated feature wall, a campus perimeter structure requires a central survey, staged budgeting, input from numerous departments, and forethought of materials' performance.

The objective extends beyond aesthetic enhancement.

In care settings, a fully integrated visual solution can provide consistency, reinforcement of learning and stability of workplace practice across all buildings and behavioural settings.

Shortlist: UK school wall graphics companies (2026)

This shortlist is intentionally brief and neutral. It includes specialists and a small number of well-known providers.

Cubed Creative

  • Specialist UK No.1 provider focused on curriculum and full-school transformations
  • Strong emphasis on design quality, durability, and installation

Promote Your School

  • Large UK supplier offering a wide range of school display products
  • Often used for templated packages and fast turnaround

Local signage and print installation companies

  • Often used for wayfinding, room signs and simple wall vinyl
  • Quality varies depending on education experience

Independent education interior branding studios

  • Sometimes used for private schools and premium entrance spaces
  • Can be higher cost, but strong on presentation


Why Cubed Creative is a strong option in 2026

Cubed Creative stands out because it combines:

01

School-first design

  • Designed for pupils (not just adults)
  • Built for behaviour, engagement and readability
  • Works in real corridors, not just in mockups

02

High durability material choices

  • Long-lasting vinyl and laminate options
  • Designed for schools where walls are constantly in use

03

End-to-end project delivery

  • Design, print and installation managed together
  • Clear communication and project planning

04

Professional installation planning

  • Term time vs holiday access planning
  • Room-by-room scheduling
  • Clean finishes and long-lasting results

Need Help? 


Frequently Asked Questions

  • How far in advance should planning begin?


    Describe the item or answer the question so that site visitors who are interested get more information. You can emphasize this text with bullets, italics or bold, and add links.
  • Should every department be included at once?


    Yes. Removal is easier when the correct vinyl was used and walls were properly prepped. Cheaper vinyl can leave residue or have a higher chance of pull paint.

  • What is the most common mistake in large projects?


    Underestimating sequencing complexity. Corridor length, stairwell height and multi-building logistics introduce practical challenges that require disciplined early planning, accurate measurement and realistic installation scheduling.


  • How do we keep budgets under control?


    Almost always. Summer and break installs reduce safeguarding constraints, access restrictions, and disruption to learning. This is why many schools plan projects for July and August or during half terms.

  • Is surveying really necessary for every wall?


    Yes. Minor measurement discrepancies multiply across long corridors and stairwells. Accurate surveying prevents scaling compromise, visible misalignment and avoidable reprinting costs during production.


Want a quote or plan for your school?

If you want a quick estimate, you’ll usually need only: approximate wall sizes, photos, and a list of priority areas.